A gabion wall separates since some time the promenade at the August-Macke-Platz from the main road. How come?, wanted to Re-know the city Council Marcus Staudacher (Green) in the building Committee.
Tegernsee – mayor Johannes Hagn (CSU) explained: The hedge, which was planted at this point, did not tolerate the salt. The city you need to walk and also place for the snow that will be cleared in the Winter from the road. “At the same time we want to create on the slightly sloping system a new Situation,” said Hagn. The gabions would not currently look certainly beautiful, but it is a greening was planned, “and then that will be a green wall.”
the transformation of The square have also been busy the town planning Committee, Hagn. Because it was but still no optimal solution, have you pushed the design, said the city hall chief. “It was planned to plant trees and to develop the design further, this is what we have but because of the budget situation by Corona.”
you can read here: damage caused by high water: Lake shore bar in Tegernsee
locked represent The gabions would be a temporary and also a safety factor. “Since many cyclists, and even children are on-the-go,” said Hagn, therefore, a boundary to the street is important. A proper wall was due to a necessary creation is currently not feasible. In addition, the city wanted to await how the design of the previous cafe Kreuzkamm develop.
Known Hotelier Korbinian Kohler has leased the Café with the overlying vacation apartments Recently. He wants to open up the “Bachmair Weissach club house”, in addition to his hotel Bachmair Weissach. The design of the August-Macke-square should be done later in a cast.
Also you might be interested in: After the fire letter because of trip lock: It remains in clear words
gr