A large site, including a full closure on the Miesbacher Straße in wooden churches. Motorists will have to use redirects.
Since Tuesday, the Miesbach road between the wars-corner and up a short before the Aral petrol station at the Holzkirchen exit-tight. The municipal works have commenced on schedule with their construction work.
As reported, to renew you in the area of water lines. The railroad crossing is now. The through traffic needs to Dodge the diversions for local residents, there are exceptions, cyclists and pedestrians are allowed to pass. This weekend, the full closure is loosened from Monday, 8. June, is a one-way regulation. Then cars can drive away, road, in direction Pisa redirects remain. Overall, the Work will take two weeks