The market Wartenberg, the area of The moat between the mountain cafe and Nikolai mountain and wants to arrange the conditions there.
Wartenberg – So that nobody gets in the way, it was also decided a change lock. The construction, planning and the environment Committee joined with the statement of decision to the procedure, which could prove to be enormously complicated.
The map contains a lot of dashed lines: plot boundaries, which are not measured. In fact, some roads do not run where they should, the Parking Situation is time – and, in places, chaotic, and threatening building projects could contribute, that everything is even more complicated.
It’s a building, however, has been more than ten years ago demolished stood there once. The owner has been waiting for with the re-development but for a very long time. Now the request for a second extension of a construction certificate on the table, and the resulted was a complete re-examination under today’s aspects. Result: unanimous rejection.
“you must assign, as a land-use plan must be”, asked Eduard Ertl (New center). “There’s a land-use plan is good and right”, sekundierte Michael Gruber (SPD).
run The roads and trails in this area, you look at the map, sometimes through the use of existing buildings through, as mayor Christian Pröbst (CSU) has said. His first idea was to integrate a larger children’s play area with a cable car down from the mountain, fell through, but in the approach to the protection of historic buildings, is not legally feasible.
The planned construction projects may require a splinter settlement, consisting of the mountain Café and other buildings, advocates argued, building Department Director Theresa what time is dessert. Now this Bauwerber is not to be made worse. It is already included in the initial planning objectives, the new building is to get to a place, closer to the buildings in the way.
you want to Continue with the development plan, the Parking situation, re-arranged, the controlled access roads and road widths. The decades apparently missed the border to come to the findings. The market Wartenberg has some land there, and the mayor Pröbst language of an assignment procedure could be required.
another suspicion: The land use plan could when show table crept in all of this, still here is something else. When she had made the plan work in the Depths of the network server to locate and projected on the wall, it was confirmed that: The housing surface is disclosed where this is in accordance with the current Considerations not to be. Thus the market is asking the municipal Council in its entirety: the Preparatory land-use plan is according to the recently adopted rules of procedure the responsibility of the big Board right now is a change in decision and in the process get in will have to.
Not planning to be touched – this was on demand from Ertl’s clear – the monument areas in the immediate vicinity. Ertl showed superbly informed, knew of an escape tunnel from the castle down of the old ramparts, but is all outside of the planning area.
Klaus Kuhn