For high-quality window follows immediately after the installation on the construction site, often the stress test. The white of the professional Association.
Frankfurt (dpa/tmn) – The installation of Windows is done by the house – and housing in General at an early stage. In many cases high-quality Windows to take in the following construction damage. A new window is comparable with a high-quality piece of furniture emphasizes the Verband Fenster + Fassade (VFF).
remedy offer, therefore here are the Pre-mounting-frames. The new window could be installed easily and cost-effectively without dirt.
a fine piece of furniture would hardly ask someone in a wet shell, emphasizes the VFF. Window in the following construction and during the cleaning a lot of dirt and moisture work exposed and would be damaged.
Pre-mounting frames, mounting frames, or cane, called reduce this risk. The Windows can be installed only shortly before the reference of the house. Moreover, there is no intervention in the fabric of the building is according to the VFF, in a later modernisation are necessary. Help and advice in the selection of the appropriate Pre frames provide window and façade specialists.