the fresh baked 2 are. and 3. The mayor of the municipality of Allershausen, and can, a few days after taking office, already a huge success: The Manuel Mück and Sepp Lerchl in the Committee on petitions requested to be threading track on the A-9 was not only approved, but is even built.
Allershausen– Josef Lerchl was beaming all over his face and clenched his fist like a tennis player after a Big Point: The SPD Council, the recently, to 3. The mayor had been elected from Allershausen, had contacted with suggestions for improvement for the A 9 motorway to the petitions Committee of the Bavarian Landtag and got fully right. The panel came with Jürgen Baumgärtner (CSU), Natasha Kohnen (SPD) and Johannes Becher (Green) to Allershausen and saw that the desire Lerchls had already been fulfilled.
Joseph Lerchl (SPD) and 2. Mayor Manuel Mück (CSU) teamed up a long time ago, in order to make the diet to the bridge construction site Allershausen attentive(we reported). In the case of interference to highway traffic Allershausen threatens to drown regularly in the traffic and congestion, and therefore, the two councils sought to impose an exit lane of the high chamber, coming between the roundabout and the driveway to Munich.
number of vehicles from the Neighbouring districts of Dachau and Pfaffenhofen to day-to-day Allershausen in the direction of Munich. Jörg Oelschlegel by the State building authorities, Freising displayed on the on-site visit on Tuesday that the excavation for the turn lane are already in place and new lanes will be completed in September. The completion of the bridge construction on the motorway, the area around the highway is tarred driveway and a traffic light system. Representatives of the police said that it would be in the area of the motorway and each year of the ten accidents. The traffic light solution showed during the bridges-renewal, as well as a construction site traffic light in the past, that the number of accidents with traffic control to Zero.
Smart light
The new highway traffic light is an intelligent system that measures the traffic in the turning lanes of the highway, and by controlling the particularly dangerous backlog prevents on the highway. “Anything is better than the previous Situation”, also said of all Stockhausen’s mayor Martin Vaas to this solution. He added, but also a little worried: “I hope the planned bypass road is not suffering from the improvements to the highway on-ramp.” Oelschlegel took him, but this fear, he stressed that it was two completely independent transport projects.
The three members of Parliament Baumgärtner, Kohnen, and cups were observed in the on-site visit so that the Petition had fallen on fertile ground. “If the petitions are allowed, then what is going on,” said Natascha Kohnen, and working for some time for improvements in Allershausen. “I have not refueled at Manuel Mück, as we’d never met us,” said, the prominent SPD politician.
Johannes Becher noted then, grinning, “that petitions in the Parliament is worthwhile”. He alluded to the fact that the two initiators Manuel Mück and Josef Lerchl recently 2. and 3. Mayor of the municipality had become. Both were visibly proud to have been a significant improvement for the municipality of Allershausen achieved.
also read: A boy of Oberhausen teacher told that the children crave in times of Corona.