On Twitter, wrote Musk, mutatis mutandis, translated, that Giga Berlin would emerge in an unimaginable speed. And: “The prefabricated construction method in Germany is extremely impressive.” So he replied on a post it goes to the question of whether the factory in Germany as fast as in Shanghai. Tesla had pulled the Shanghai plant within eleven months, there is an Expansion is already running. By the summer of 2021, the US electric car manufacturer wants to build in green Heath, around 500 000 vehicles a year. Currently, preparations for the shell to run. The full environmental permit for the first factory in Europe, by the Land of Brandenburg, is still to be, that is why Tesla has begun at your own risk with early construction. Most recently, the company had requested the use of piles. On Friday it became known that Tesla wants to produce for the factory in green Heath, the batteries on the spot. In the second quarter, Tesla had earned despite the impact of the Corona-pandemic a Surplus of $ 104 million (90 million euros) after a loss in the previous year.
dpa